YOUR CRANE. YOUR JOBSITE. 30 DAYS.Try No Shock with a free field demo

NO SHOCK / CRANE PROTECTION

Big jobs.
Less shake.

Protect your crane. Keep your job moving.

Reduce pile-driving vibration before it reaches your crane. Less strain on your equipment. A smoother day in the cab.

✓ No purchase commitment · Your own jobsite

Freight excluded. Subject to availability.

DESIGNED BYAntaeusBuilt for pile driving.
Made to protect your investment.
NO SHOCK IN ACTIONPRODUCT VIDEO
Meet No Shock.See how No Shock isolates vibration between your hammer and crane.
0:44
90–95%

Vibration dampeningHelping protect your boom and critical components.Manufacturer-reported performance.

30Days to feel the differenceFree field demo · freight excluded
02Models. One tough design.Lightweight & Heavy Duty
✓Your job. Your choice.Rent, buy, or explore financing

LESS SHAKE. LESS STRAIN.

Hard on the pile.
Easier on your crane.

01 / CRANE PROTECTION

Reduce vibration.
Protect your investment.

No Shock absorbs and isolates vibration, helping protect the equipment you depend on every day.

02 / FEWER INTERRUPTIONS

Less wear.
More work.

Reducing vibration-induced wear can help reduce repairs, downtime, and costly interruptions to the job.

03 / OPERATOR COMFORT

A smoother day
in the cab.

Less vibration reaching the crane means a smoother operating environment and can help reduce operator fatigue.

PURPOSE-BUILT BY Antaeus

Simple. Rugged.
Ready to work.

Serious protection doesn’t need to be complicated. Heavy-duty shackles. Very few moving parts. A design made for demanding pile-driving applications.

Heavy-duty Green Pin® shackles

Van Beest shackles provide the strength and durability demanded by pile-driving operations.

See your dampening range

The built-in indicator pin and scale give operators a visual reference for the selected elastomer’s ideal range.

Help me find my No Shock

FIND YOUR FIT

Find the right No Shock.
We’ll help you choose.

You don’t need to choose on your own. Tell us about your crane, hammer, and project. Before anything ships, we’ll confirm the right model and configuration with you.

FOR WEIGHT-SENSITIVE APPLICATIONSLW

Lightweight

Well suited to mobile and telescopic cranes where suspended weight is a concern.

Antaeus No Shock Lightweight with upper and lower shackles
0–15tonsIDEAL DAMPENING RANGE
Purchase price
$43,000
Shackle configurations
85 or 175 ton
Inquire about Lightweight
FOR DEMANDING PILE-DRIVING WORKHD

Heavy Duty

The original heavy-duty configuration, built for demanding pile-driving applications.

Antaeus No Shock Heavy Duty with upper and lower shackles
0–45tonsIDEAL DAMPENING RANGE
Purchase price
$46,000
Shackle configurations
85 or 175 ton
Inquire about Heavy Duty

Ideal dampening range is not rated lifting capacity. Confirm configuration, load limits, pricing, and freight with the team.

ANOTHER WAY TO GET TO WORK

Rent from $4,500 / month

Buying? Ask about 6-, 12-, or 18-month financing options.

Talk rental & financing

I can barely feel that the vibro is even hanging from the crane, incredible.

CRANE OPERATOR Pulling a steel pipe pile with an HPSI 500
AntaeusNO SHOCK IN THE FIELD

PUT IT TO THE TEST

Try it on your job.
30 days. On us.

Reading about it is one thing.
Feeling the difference on your own crane is another.

Request your free field demo

No purchase commitment. Freight excluded.
Subject to availability.

01

Tell us about your setup.

Share your crane, hammer, jobsite, and timing. We’ll help identify the right No Shock.

02

Get it on your jobsite.

Confirm availability, freight, and rigging details with the team before your demo begins.

03

Experience it. Then decide.

Put No Shock to work for 30 days. Explore renting or buying when you’ve seen what it can do.

LET’S TALK ABOUT YOUR NEXT JOB

Ready for a
better day in the cab?

Get a recommendation for your setup, request a quote, or ask about a free 30-day field demo.

  • Help choosing the right configuration
  • Rental and purchase options
  • No purchase commitment for your demo
PREFER TO TALK IT THROUGH?

Get your No Shock recommendation

A few details will help us get you started.

I’m interested in
Add your equipment & timing (optional)

Demo availability and freight will be confirmed with you. No purchase commitment.

GOOD QUESTIONS. STRAIGHT ANSWERS.

Before you
put it to work.

Inquire, and we’ll reach out
How does No Shock protect my crane?

No Shock uses rubber elastomers to isolate vibration before it travels from the vibratory hammer into the crane. This can help reduce vibration-related wear and create a smoother operating environment. Results depend on your equipment and application.

Which model is right for my equipment?

You don’t need to decide before reaching out. Share your crane, hammer, suspended weight, and application. We’ll recommend a model and confirm the configuration with you before it ships. The ranges shown above are ideal dampening ranges, not lifting capacities.

Can I use it with a mobile or telescopic crane?

Yes. No Shock is used with mobile and telescopic cranes and connects through heavy-duty shackles. We’ll review your crane, hammer, and rigging arrangement to confirm the appropriate setup.

Can it be used for both pile driving and extraction?

Yes. No Shock is used for both pile installation and extraction. Tell us about both parts of your job so we can account for suspended weight and extraction demands when recommending your configuration.

What’s included in the free 30-day demo?

Try No Shock on your crane, at your jobsite, for 30 days with no purchase commitment. Freight is excluded, and demos are subject to availability. We’ll confirm timing, logistics, and demo terms with you.

Can I rent instead of buying?

Yes. No Shock is available to rent or purchase. Ask us about current availability, pricing, and financing options for your project.

What maintenance does No Shock need?

Routine care includes daily visual checks and scheduled inspections of the elastomers, shackles, and fasteners. Our team can provide maintenance guidance and replacement elastomers to help keep your unit ready for work.

Feel the difference.Free 30-day field demo*
Get a free demo